Camus Hydronics DMC103 Guide d'installation

Naviguer en ligne ou télécharger Guide d'installation pour Chauffe-eau et chaudières Camus Hydronics DMC103. Camus Hydronics DMC103 Installation guide Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 51
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
6226
Netherhart Road, Mississauga, L5T 1B7, 905
-
696
-
7800
DynaFlame/DynaForce
BMS Protocol
(Modbus, Bacnet IP,
Bacnet MSTP, LONWorks,
Metasys N2) Installation
Guide
93-0238 Rev. 3.2
Vue de la page 0
1 2 3 4 5 6 ... 50 51

Résumé du contenu

Page 1

6226 Netherhart Road, Mississauga, L5T 1B7, 905-696-7800 DynaFlame/DynaForce BMS Protocol (Modbus, Bacnet IP, Bacnet MSTP, LONWorks

Page 2 - Table of Contents

Page 10 of 51 1.10 Connect to the ProtoNode using RUI (Ruinet) - Double click on the debugging utility, “RUINET” (Remote User Interface). The

Page 3

Page 11 of 51 1.10.1 Changing the Modbus Address o Change the Modbus Address on the DynaFlame/DynaForce SOLA  Go to [Configure]  Go to Syste

Page 4 - Page 4 of 51

Page 12 of 51 1.11 Troubleshooting Tips Connection to the ProtoNode - Confirm that the network cabling is correct - Confirm that the computer

Page 5 - Page 5 of 51

Page 13 of 51 No communication with BMS. NOTE: If a dipswitch setting is altered, power to the Protonode must be reset Troubleshooting steps

Page 6 - Page 6 of 51

Page 14 of 51 1.12 ProtoNode Specifications Table 2: ProtoNode RER/LER Specifications BacNet MSTP, BacNet IP and Metasys N2 Protocol Gateway

Page 7 - Page 7 of 51

Page 15 of 51 Light Description PWR This is the power light and should show steady green at all times when the FPC-FD2 is powered. SYS ERR The

Page 8 - 1.7 Power Up the Device

Page 16 of 51 LonWorks Protocol Gateway Light Description PWR This is the power light and should show steady green at all times w

Page 9 - Page 9 of 51

Page 17 of 51 ProtoCarrier 485 (FPC-CD2) RS-485 Signal LEDs The RS-485 Signal LEDS are each labeled and correspond to the respective

Page 10 - Page 10 of 51

Page 18 of 51 2.2 Bacnet, Modbus and Metasys N2 Registers Table 5: Modbus and Bacnet IP/MSTP Register Addresses Parameter Name Modbus Address (

Page 11 - Page 11 of 51

Page 19 of 51 11 = Warm weather shutdown Outlet Sensor 0007 0007 AI/AI 3 2 R -40 – 130oC (0.1oC precision)1 Firing Rate 0008 0008 AI/AI 4 0 R Act

Page 12 - 1.11 Troubleshooting Tips

Page 2 of 51 DynaFlame/DynaForce SOLA and BMS Protocols Table of Contents 1.1 Bacnet/LONWorks/Metasys N2Setup through Protocessor Protonode RER/

Page 13 - Page 13 of 51

Page 20 of 51 35 = Standby delay 36-47 = Reserved 48 = Normal standby 49 = Preparing 50 = Ignition 51 = Firing 52 = Postpurge 53-65535 = Reserved

Page 14 - Page 14 of 51

Page 21 of 51 1 = Disabled 2 = Normal 3 = Suspended CH Setpoint Source 0041 0065 AI/AI 24 23 R 0 = Unknown 1 = Normal Setpoint 2 = Time of Day Se

Page 15 - Page 15 of 51

Page 22 of 51 Pump A Status 005D 0093 AI/AI 32 31 R Bitmap 15 – 14 = Reserved 13 = Auxiliary 2 pump demand 12 = Auxiliary 1 pump demand 11 = Syst

Page 16 - LonWorks Protocol Gateway

Page 23 of 51 Cycle Count DHW Pump Cycle Count 0086-0087 0134-0135 AV/AO 92 4 R/W 0-999,999 System Pump Cycle Count 0088-0089 0136-0137 AV/AO 93

Page 17 - RS-485 Signal LEDs

Page 24 of 51 11 = System pump demand 10 = Boiler pump demand 9 = DHW pump demand 8 = CH pump demand Reason 7 = Reserved 6 = Pump assigned to log

Page 18

Page 25 of 51 1 = On CH Enable 00D0 0208 AV/AO 48 R/W 0 = Disable Central Heating 1 = Enable Central Heating CH Setpoint 00D3 0211 AV/AO 49 48

Page 19

Page 26 of 51 DHW Frost Protection Enable 0211 0529 AV/AO 61 R/W 0 = Disable 1 = Enable Outdoor Frost Protection Setpoint 0212 0530 AV/AO 62 R/

Page 20

Page 27 of 51 Slave Command 0235 0565 AV/AO 98(Boiler Firing Rate using percentage), 99 (Boiler Firing Rate using Binary), 100 (Boiler Enable) R

Page 21

Page 28 of 51 Slave 6 State 0316 0790 AI/AI 83 82 R 4 = Firing 5 = On leave 6 = Disabled 7 = Recovering Slave 7 State 031A 0794 AI/AI 85 84 R Sla

Page 22

Page 29 of 51 1 All temperature registers are expressed in oC regardless of what temperature units are set to on the boiler, ex. 32.0oC = 320.

Page 23

Page 3 of 51 1.1 Bacnet/LONWorks/Metasys N2Setup through Protocessor Protonode RER/LER Installation steps for the customer 1. Record the inf

Page 24

Page 30 of 51 2.3 Lockout Codes Table 6: Lockout Codes Code Description Note 0 None No lockout/hold 1 Unconfigured safety data Lockout 2 Waitin

Page 25

Page 31 of 51 38 Internal fault: Safety key 6 Lockout 39 Internal fault: Safety key 7 Lockout 40 Internal fault: Safety key 8 Lockout 41 Internal

Page 26

Page 32 of 51 105 Flame detected out of sequence Lockout 106 Flame lost in MFEP Lockout 107 Flame lost early in run Lockout 108 Flame lost in run

Page 27

Page 33 of 51 175 Safety relay open Lockout 176 Main relay ON and safe start check Lockout 177 Pilot relay ON at safe start check Lockout 178 Saf

Page 28

Page 34 of 51 230 Invalid CH demand source setting Lockout 231 Invalid Delta T limit delay setting Lockout 234 Invalid outlet high limit enable s

Page 29

Page 35 of 51 21 Invalid safety group verification table was not accepted 22 CRC errors were found in application configuration data blocks 23 Ba

Page 30

Page 36 of 51 70 No demand source was set due to demand priority conflicts 71 CH 4-20mA signal was invalid 72-73 RESERVED 74 Periodic Forced Recy

Page 31

Page 37 of 51 122 Modulation commanded rate was < min modulation rate 123 Modulation rate was limited due to Outlet limit 124 Modulation rate

Page 32

Page 38 of 51 172 DHW temperature was invalid 173 DHW inlet temperature was invalid 174 DHW outlet temperature was invalid 175 DHW high limit mus

Page 33

Page 39 of 51 222 CH frost protection temperature was invalid 223 CH frost protection inlet temperature was invalid 224 DHW frost protection temp

Page 34

Page 4 of 51 1.4 Configure the DIP Switches 1.4.1 Setting the Protocol that is required on site. Selecting the required Protocol To confi

Page 35

Page 40 of 51 274 Abnormal Recycle: Demand off during Pilot Flame Establishing Period 275 Abnormal Recycle: LCI off during Drive to Purge Rate 27

Page 36

Page 41 of 51 324 Abnormal Recycle: Hardware flame bias 325 Abnormal Recycle: Hardware static flame 326 Abnormal Recycle: Hardware flame current

Page 37

Page 42 of 51 374 Abnormal Recycle: Hardware flame bias high 375 Abnormal Recycle: Hardware flame bias low 376 Abnormal Recycle: Hardware flame b

Page 38

Page 43 of 51 491 Internal error: Safety key bit 13 was incorrect 492 Internal error: Safety key bit 14 was incorrect 493 Internal error: Safety

Page 39

Page 44 of 51 548 Delta T rate limit enable was invalid 549 Delta T exchanger/outlet wasn't allowed due to stack limit setting 550 Delta T i

Page 40

Page 45 of 51 Appendix A A7 A6 A5 A4 A3 A2 A1 A0 Address Off Off Off Off Off Off Off Off 0 Off Off Off Off Off Off Off On

Page 41

Page 46 of 51 Off Off On Off On Off On On 43 Off Off On Off On On Off Off 44 Off Off On Off On On Off On 45 Off Off On Off On

Page 42

Page 47 of 51 Off On Off On On Off Off On 89 Off On Off On On Off On Off 90 Off On Off On On Off On On 91 Off On Off On On O

Page 43

Page 48 of 51 On Off Off Off Off On On On 135 On Off Off Off On Off Off Off 136 On Off Off Off On Off Off On 137 On Off Off Of

Page 44

Page 49 of 51 On Off On On Off On Off On 181 On Off On On Off On On Off 182 On Off On On Off On On On 183 On Off On On On Of

Page 45 - Appendix A

Page 5 of 51 FPC-N34-103-122-0565 Dipswitch settings ProtoCarrier Dipswitches ProtoCessor Dipswitches S0 S1 S2 S3 A1 A2 A3 A4 A5 A6

Page 46 - Page 46 of 51

Page 50 of 51 On On On Off Off Off On On 227 On On On Off Off On Off Off 228 On On On Off Off On Off On 229 On On On Off Off

Page 48 - Page 48 of 51

Page 6 of 51 1.4.2 Setting the Node/ID Device Instance (Dipswitch A0 – A7) The DIP switches on the ProtoNode RER and LER allow users to set the

Page 49 - Page 49 of 51

Page 7 of 51 1.5 Connection from DynaFlame/DynaForce to ProtoNode The DynaFlame/DynaForce terminals J3-MB2 (+, -, GND) are connected to the Pro

Page 50 - Page 50 of 51

Page 8 of 51 1.7 Power Up the Device Apply power to the device. Ensure that the cable is grounded using the “Frame-GND” terminal. The Pro

Page 51 - Page 51 of 51

Page 9 of 51 - Disable any wireless Ethernet adapters on the PC/Laptop - Disable firewall and virus protection software - Connect an Ethernet